County service area
Standby Generator Installation in McLennan County, TX
Waco, the towns around it and a lot of farm country, where seven households in ten heat with electricity. When the power goes out here in January, the heat goes with it. We are based in Whitney, just north of the county line.

The defining number
70.7 percent electric heat
That is the share of McLennan County households that heat with electricity, per the Census Bureau's 2020–2024 American Community Survey. Even inside Waco it is 67 percent. It should shape every proposal written here.
Heat pumps and electric furnaces. When the meter stops, nothing else in the house makes heat.
Concentrated inside the towns, where Atmos Energy runs the mains.
Mostly out on acreage. Where a tank already sits, half the fuel conversation is done.
Waco Regional Airport, 10 to 19 February 2021. A new record there, per the National Weather Service.
During Winter Storm Uri the Waco airport bottomed out at minus 1°F on 16 February and stayed at or below freezing from the night of 10 February until late morning on the 19th. That’s more than eight days. Dallas–Fort Worth, for comparison, logged 139 hours. In a county where most houses have no combustion heat at all, a long outage during a stretch like that is a plumbing problem and a safety problem, not an inconvenience.
An all-electric house also asks more of a generator than a gas-heated house the same size, because the heat strips and the compressor are on the backed-up load. That pushes the machine size up, and it’s where load management earns its keep. We start every job with a load calculation, not a model number.
The utilities
Four different companies own wire in this county
One delivery utility in the competitive retail market, and three member-owned cooperatives where there is no retail provider to shop.
Oncor Electric Delivery
The wire company for Waco. Oncor owns the poles and restores the power; the company on your bill is a retail provider you chose.
Heart of Texas Electric Cooperative
Headquartered in McGregor. Formed on 1 July 2007, when McLennan County Electric Cooperative and Belfalls Electric Cooperative consolidated. Serves parts of Bell, Bosque, Coryell, Falls, Hamilton, McLennan and Milam counties.
HILCO Electric Cooperative
Began as Hill County Electric Cooperative, with its first line energized in December 1936. Serves Hill, Johnson, Ellis, Dallas and McLennan counties, so it is the same co-op behind a lot of meters in our home county.
Navasota Valley Electric Cooperative
Based in Franklin and serving parts of nine counties, McLennan among them.
All three cooperatives buy wholesale power through Brazos Electric Power Cooperative. In March 2021, with ERCOT invoices from the Uri week totaling more than $2.1 billion, Brazos filed for Chapter 11. That’s the clearest sign of how hard that week landed on the co-op side of the map.
Restoration follows the same order everywhere: transmission first, then main feeders, then tap lines, then individual services. A house in a Waco subdivision and a house at the end of a long county-road tap are not in the same place on that list. What answers it is a permanent system with an automatic transfer switch, not a portable you wheel out of the garage.
Fuel
Atmos inside the towns, propane past the city limits
One gas utility serves every city in this county that appears on the state's natural gas service table. Outside those limits, the tank is the plan.
Waco
Atmos Energy Mid-Tex, with about 20,500 residential gas consumers in 2022 per the Railroad Commission of Texas. A natural gas tie-in is usually available, so the question becomes whether the meter and the line can carry a generator at full load on top of everything already on them.
The other towns
Woodway, Hewitt, Robinson, Bellmead, Lacy-Lakeview, Beverly Hills, Lorena, McGregor, West, Mart, Moody, Crawford, Riesel, Ross and the McLennan County parts of Valley Mills and Bruceville-Eddy. Every one is listed under Atmos Energy Mid-Tex. No other gas utility appears.
Everywhere else
Unincorporated places such as China Spring don’t appear on that table, so gas there is an address-by-address question. Where there is no main, the generator runs on propane, and the tank is sized for the generator rather than for the range and the water heater.
Propane is not a compromise fuel. It stores on site and doesn’t depend on anything upstream of the tank. The design details that matter are regulator sizing, tank placement relative to the generator and the house, and vaporization capacity when it’s cold and the tank is low. Get the last one wrong and you have a machine that runs fine in October and struggles in February. Our propane versus natural gas guide walks through the trade-offs.
Permits and siting
City lot or county acreage, the paperwork differs
Texas rewrote the rules for residential backup power in 2025. Waco has published its own process since. Out in the county, the septic system decides where things can go.
What the state changed
SB 1252 took effect on 1 September 2025. It bars a city from regulating the installation or inspection of a residential backup system that supplies no more than 50 kW or stores no more than 100 kWh. Cities that own their electric utility are exempt. Waco is on Oncor, so it isn’t one of them.
Licensing did not change. The work still has to be done by a licensed Texas electrical contractor to the National Electrical Code.
Inside Waco
The City publishes an Alternative Power Source permit for generators and batteries. Its checklist asks for a site plan showing the generator, transfer switch, disconnects and any fuel tank, a one-line diagram showing which loads the switch serves, and the equipment ratings. Fuel supply and the pad can need separate permits.
One- and two-family homes can use third-party plan review and inspection. The City still does any inspection needed to establish or reconnect electrical service. We check the current process before every job.
Out in the county
Through an agreement between the City of Waco and McLennan County, the Waco-McLennan County Public Health District administers the on-site sewage program for the county, its cities and Waco. Off the sewer main, the drainfield is a permitted, mapped feature of the lot.
So the pad, the conduit trench and any propane tank get sited around it, and the well pump goes on the load list. It’s often the biggest starting load in the whole calculation.
The housing stock is mostly what a standby system is designed for. The same Census survey counts 108,454 housing units in the county, 67 percent of them detached single-family houses and 5.2 percent manufactured homes, with a median year built of 1983 and 61.8 percent owner-occupied. A house built in the early 1980s often has a panel that has already absorbed decades of added loads, which is why a panel upgrade sometimes comes before the generator.
What we do here
Waco houses, county acreage and small businesses
The same work we do across Hill and Johnson counties, designed around this county's utilities and fuel.
Standby Generator Installation
Atmos gas tie-ins inside the towns and propane systems on acreage, Generac and Kohler.
See detailsGenerator Sizing
Electric heat plus a well pump makes for a bigger number than most people expect.
See detailsLoad Management
The cheapest way to keep an all-electric house on one machine size rather than the next one up.
See detailsCommercial Generators
Clinics, churches, shops and ag operations, where an outage costs money rather than comfort.
See detailsGenerator Maintenance
Scheduled service that keeps the machine ready and the warranty paperwork in order.
See detailsHome Battery Backup
Battery storage on its own or alongside solar, for homes that want silent backup.
See details
Nearby
Our base and the counties beside this one
McLennan, Hill and Johnson are the three counties we treat as home.
- Whitney, TXWhere we are based, in Hill County just north of the McLennan County line.
- Hill County, TXThe county directly north, where HILCO began as Hill County Electric Cooperative.
- Johnson County, TXNorth of Hill County, and the third county in our primary area.
- Burleson, TXThe northern end of our primary area, on the Johnson County side.
Common questions
McLennan County questions
Utilities, fuel, permits and heat, in roughly the order they come up on the phone.
Am I on Oncor or one of the co-ops?
It depends which side of a line you are on, and in this county there are four possible answers. Oncor Electric Delivery serves Waco; it is a delivery utility in the competitive market, so a retail provider of your choosing bills you and Oncor restores you. Heart of Texas Electric Cooperative, headquartered in McGregor, HILCO Electric Cooperative and Navasota Valley Electric Cooperative all serve parts of the county too, and co-op members have no retail provider to shop. The name at the top of your bill is the quickest reliable answer, and we confirm it before we quote.
Can I run a generator on natural gas here?
Inside most of the towns, probably. The Railroad Commission of Texas lists Atmos Energy Mid-Tex as the gas utility for every McLennan County city on its natural gas service table, from Waco, Woodway, Hewitt and Robinson to West, Mart, Moody, McGregor and Crawford. Outside the city limits there is often no main to reach, so the generator runs on propane from a tank on the property. Where there is a gas meter, the real question is whether the meter and the line can carry a generator on top of the furnace, water heater and range, and we check that on the site visit.
Do I need a permit for a generator in Waco?
The state changed this on 1 September 2025. Texas SB 1252 bars a city from regulating the installation or inspection of a residential backup power system rated at 50 kW or less, unless the city owns its electric utility, and Waco does not. The City of Waco still publishes its own path for home backup power, an Alternative Power Source permit with a third-party review and inspection option for one- and two-family homes, and the City itself handles any inspection needed to establish or reconnect electrical service. Licensing did not change: the work still has to be done by a licensed Texas electrical contractor to the National Electrical Code, which is what TECL #41587 covers. We confirm the City's current process before every job.
Why is an outage harder on a house here than in a gas-heated county?
Because most houses here have nothing else that makes heat. The American Community Survey puts 70.7 percent of McLennan County households on electric heat, 24.4 percent on piped gas and 3.7 percent on propane. In February 2021 the National Weather Service recorded minus 1°F at the Waco airport and 205 consecutive hours at or below freezing, a new record there. An all-electric house without power through a week like that is a cold house with pipes at risk, and on a private well it is also a house without water.
We are on a well and a septic system outside town. What changes?
The load list and the pad location. A submersible well pump is often the largest starting load in the house, so it drives the generator size, and a septic aerator has to stay on the backed-up circuits. On-site sewage in this county is administered by the Waco-McLennan County Public Health District, under an agreement between the City of Waco and the county, so the drainfield is permitted and mapped. We site the pad, the trench and any propane tank clear of it.
You are based in Whitney. Do you cover the whole county?
McLennan County is one of the three counties we treat as home, alongside Hill and Johnson. Whitney sits in Hill County, just north of the McLennan County line, so Waco, China Spring, West, McGregor, Hewitt and the country between them are all part of our regular map. Tell us where the property is when you request an estimate and we will tell you plainly how scheduling works for that address.
Related
Keep reading
- Standby Generator InstallationDesign, permits, pad, transfer switch, fuel and live load testing.
- Propane vs Natural GasHow to choose when a gas main may or may not reach the property.
- Load ManagementHow a smaller generator carries a bigger all-electric house.
- Generator SizingLoad calculations for electric heat, well pumps and septic aerators.
- WhitneyWhere we are based, just north of the county line.
- Maintenance PlansAnnual and bi-annual service across the county.
Two ways to start
Which one are you?
Need a generator
We start with what has to keep running at your property (the well, the AC, the freezer, the shop) and size the system around it. You get a written proposal with the equipment, the electrical work and the site prep all in one number.
Already own one
Repair, diagnostics and scheduled maintenance for Generac, Kohler and Briggs & Stratton systems, including units another company installed. Tell us the brand and what it is doing and we will bring the right parts.