Skip to main content

TECL #41587

County service area · home county

Backup Power Across Hill County, TX

About a thousand square miles of Blackland Prairie and Cross Timbers, with the Brazos River for a western boundary, five electric utilities on file and nine towns with a gas main. We are based in Whitney, on the lake side of the county.

An Armored Power Systems technician working inside a meter and disconnect enclosure on a pole at the edge of a pasture.

The defining fact

Five companies file electric territory in this county

Two are delivery utilities in the competitive retail market. Three are member-owned cooperatives with no retail provider to shop. One of them started life as Hill County Electric Cooperative.

Electric utilities operating in Hill County and their reported reliability
UtilityTypeRetail choice2021 minutes off2024 minutes off
HILCO Electric CooperativeCooperativeNo805.8124.1
Oncor Electric DeliveryDelivery utilityYes558.8532.5
Texas-New Mexico PowerDelivery utilityYes203.7Not shown
Navarro County Electric CooperativeCooperativeNoNot reportedNot reported
Navasota Valley Electric CooperativeCooperativeNo31,6261,743.1

Average annual minutes without power per customer, including major event days, as filed with the U.S. Energy Information Administration. Each figure is system-wide, not Hill County alone. Cooperatives report under IEEE 1366 and the delivery utilities under a different standard, so read these as directional. Navasota Valley spans nine counties reaching south to Brazos County, and Hill sits at the northern edge of it. Texas-New Mexico Power’s 2024 figure is dominated by events outside this region and is left out on purpose, and Navarro County Electric Cooperative did not report a figure for either year.

HILCO is the one most people out here mean when they say “the co-op.” It began as Hill County Electric Cooperative, energized its first line on 21 December 1936 and was incorporated in May 1937. It is still headquartered in Itasca, keeps a district office in Whitney, and now serves parts of Hill, Johnson, McLennan, Ellis and Dallas counties over more than 3,000 miles of line. It reported 35,196 customers to the EIA for 2024, which works out to fewer than twelve customers per mile of wire.

The 2021 column is Winter Storm Uri. A HILCO member averaged more than thirteen hours without power that year, against about nine for an Oncor customer. Neither number is an indictment. Restoration everywhere runs in the same order: transmission first, then main feeders, then tap lines, then individual services. A house at the end of a long rural tap is structurally near the back of that line, and what answers that is a permanent system with an automatic transfer switch, not something wheeled out of a shed.

Fuel

Nine towns have an Atmos main. The rest of the county has a tank.

Atmos Energy Mid-Tex is the only investor-owned gas utility the Railroad Commission of Texas lists anywhere in Hill County. Residential customers by town, calendar year 2022:

Hillsboro

1,447 residential consumers. The county seat and by a wide margin the largest gas system in the county.

Hubbard and Itasca

355 and 337 residential consumers. Real systems in town. Past the town limits, check before assuming.

Whitney

323 residential consumers in town. The lakeshore communities around it do not appear on the registry at all.

Abbott and Blum

112 and 86 residential consumers, on opposite sides of the county.

Malone, Covington, Penelope

62, 49 and 47 residential consumers. Small systems. We confirm the meter can carry a generator before specifying gas.

Everywhere else

Aquilla, Bynum, Mount Calm, the lake and every unincorporated road between the towns: no gas utility listed.

HILCO even runs propane fill stations at its Whitney and Elm Mott offices. For a generator, propane is the better-performing fuel per unit, so an engine reaches its full rated output on it, and that matters when a well pump has to start against a house that is already running. What propane costs you is unlimited runtime. Tank size, regulator selection and cold-weather vaporization are part of the design, not delivery details to sort out later.

The lake

Lake Whitney sets the character of the west side

A federal flood-control reservoir on the Brazos, and a shoreline that does not appear anywhere on the gas registry.

A Corps of Engineers lake

The U.S. Army Corps of Engineers began the dam in May 1947 and finished it in April 1951, and the lake began filling that December. It sits on the Brazos River along the Hill and Bosque county line, about two miles from the town of Whitney, and the Texas Water Development Board puts it at about 23,220 surface acres at conservation pool.

It was built for flood control first, with water supply, recreation and a hydroelectric powerhouse completed in 1953. Lake Whitney State Park, 775 acres on the east shore, opened to the public in 1965.

What that means for the system

Lakeside property here is typically off any gas main, on septic, and on co-op or delivery-utility line that runs a long way between meters. Plenty of lake places are not occupied every week. So the design brief is specific: an LP machine, a tank sized for days rather than hours, a pad clear of the drainfield and the slope, and remote monitoring so a fault reaches somebody’s phone before it reaches the freezer.

A lake lot also tends to be tight. Setbacks from the house, the tank and the septic system all compete for the same few flat feet, and we work that out on the site visit rather than on install day.

Rules that shape the install

Three things decided before the pad is poured

None of them are about the generator itself, and all of them change the job.

Septic in the county

Outside the towns, on-site sewage permits and inspections run through Hill County Development Services. The drainfield is usually the thing a generator pad has to work around, and on an aerobic system the aerator is one more load that has to stay running.

SB 1252 inside city limits

Since 1 September 2025, Texas cities may not regulate the installation or inspection of a residential backup system of 50 kW or less unless the city owns its electric utility. No municipal electric utility files territory in Hill County. Licensing did not change, which is where TECL #41587 comes in.

Water and well loads

Where a property is on a private well, the pump is both the first thing that stops in an outage and the largest starting load in the sizing calculation. Motor starting current, not square footage, decides the machine.

Common questions

Hill County questions

Utilities, gas, the lake and permits, in the order they come up on the phone.

Five electric utilities in one county? Which one is mine?

HILCO Electric Cooperative, Oncor Electric Delivery, Texas-New Mexico Power, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative all file service territory in Hill County with the U.S. Energy Information Administration. Oncor and TNMP are delivery utilities in the competitive market, so a retail provider sends the bill. The three cooperatives are member-owned and have no retail choice. Rate-comparison sites do not even agree on which delivery utility serves some ZIP codes here, so we read your bill rather than guess.

Can I run a generator on natural gas out here?

In nine towns, possibly. The Railroad Commission of Texas lists Atmos Energy as the gas utility in Abbott, Blum, Covington, Hillsboro, Hubbard, Itasca, Malone, Penelope and Whitney, and no other investor-owned gas utility anywhere in the county. Aquilla, Bynum and Mount Calm are not on that list, and neither is any lakeshore community. Away from those nine town systems, plan on propane. Even in town, we check that the meter and service line can carry a generator on top of the house before we spec a gas tie-in.

Why is Winter Storm Uri still on my HILCO bill?

Because HILCO buys its power through Brazos Electric, the wholesale cooperative that filed for Chapter 11 in March 2021 after Uri. HILCO says its share of what Brazos owed ERCOT was $154 million before the bankruptcy and $121 million after it. That balance was securitized under Senate Bill 1580, and HILCO says the charge applies to new members as well as existing ones and stays with the meter until the term ends after 2050. A generator does not touch that line item. It changes what the next long outage costs you at home.

Do I need a permit in unincorporated Hill County?

Hill County publishes its permitting for unincorporated land through Development Services, and what it lists is septic, 911 addressing and culverts. On-site sewage facility permits are applied for and inspected through that office. We confirm with the county before a job whether anything else applies to the property. Inside a city, Texas SB 1252 has barred municipalities from regulating the installation or inspection of a residential backup system of 50 kW or less since 1 September 2025, except where the city owns its electric utility, and no municipal electric utility files territory in this county.

Whitney Dam makes electricity. Does that help in an outage?

No, and it is a fair question. The Corps of Engineers built a hydroelectric powerhouse at the dam, finished in 1953, and it feeds the regional grid like any other plant. When a tree takes down the line on your road, it does not matter how much power is being made upstream: nothing reaches the house until that line is repaired. A standby generator with an automatic transfer switch is local to the property, which is the whole point of it.

I have a lake place I only get to on weekends. What changes?

Mostly the monitoring and the maintenance schedule. A house nobody is in can sit with a fault light on for a week before anyone notices, and a freezer, a sump or a well pump is not going to wait that long. We specify remote monitoring so a problem reaches your phone, size the propane tank for days rather than hours, and set the pad clear of the drainfield, which on a lake lot is often the tightest constraint on the site.

Two ways to start

Which one are you?

Need a generator

We start with what has to keep running at your property (the well, the AC, the freezer, the shop) and size the system around it. You get a written proposal with the equipment, the electrical work and the site prep all in one number.

Get a Generator Estimate

Already own one

Repair, diagnostics and scheduled maintenance for Generac, Kohler and Briggs & Stratton systems, including units another company installed. Tell us the brand and what it is doing and we will bring the right parts.

Call NowGet an Estimate