Skip to main content

TECL #41587

Service area

Standby Generator Installation in Johnson County, TX

Suburbs at the top, farmland at the bottom, and three different electric utilities in between. Johnson County sits directly north of us in Hill County, and the right generator here depends on which end of it you live in.

An Armored Power Systems technician working inside a meter and disconnect enclosure on a pole at the edge of a pasture.

The county

A county growing fast from the top down

The 2020 census counted 179,927 people in Johnson County. The Census Bureau’s estimate for July 2024 was 210,547, roughly 17 percent more in four years. It covers 734 square miles with Cleburne as the county seat, and it is part of the Dallas–Fort Worth metropolitan area even where it doesn’t look like it.

Most of that growth arrives from the north. I-35W runs down through Burleson and Alvarado, and the Chisholm Trail Parkway, opened in May 2014, runs 27.6 miles from Fort Worth to US 67 at Cleburne. Close to those roads the county is new subdivisions on platted lots. South and west of Cleburne it is pasture, long gravel drives and homes on co-op line. The census survey puts the median home here at 1997, with 45 percent of all housing built since 2000.

So we don’t quote this county as one market. A Burleson install is a load management and siting problem on a quarter-acre lot. An install outside Godley or Grandview is a fuel, distance and well pump problem. We’re based in Whitney, just across the Hill County line, and we design for whichever one is in front of us.

Who owns the wire

Three electric utilities, and your bill says which

It decides who you call when the power goes out, whether you have a retail provider at all, and where your line sits in the restoration order.

Oncor Electric Delivery

The poles and wires across most of the towns. You buy power from a retail provider of your choosing; Oncor delivers it and restores it. At the peak of the 4 March 2025 wind event, Oncor reported more than 335,000 outages across its service area.

United Cooperative Services

Member-owned, with offices in both Burleson and Cleburne. It formed in 2000 when the Johnson County and Erath County electric co-ops consolidated, so this is the county it grew out of.

HILCO Electric Cooperative

Headquartered in Itasca, in Hill County, and listing Johnson among the five counties it serves. Its territory is set by a certificate from the Public Utility Commission, which gives it the exclusive right to serve inside those lines.

The utility doesn’t change the generator much. It changes the expectations around it. A long rural co-op feeder can lose a span of line to one fallen tree, and restoration generally starts with the lines that serve the most people. That’s exactly the case an automatic transfer switch is built for: it watches the utility voltage itself and starts the house back up whether anyone is home or not.

What decides the design

Four things that change from one end of the county to the other

Four homes in five heat with electricity

That is the county-wide figure from the census survey, 79.5 percent. When the meter stops, so do the heat pump, the water heater and often the stove. It pushes the generator size up, and load management is usually the cheaper answer than the next size of machine.

Fuel is a town-or-country question

Atmos Energy serves Cleburne and Burleson. Past the city limits a standby unit usually means propane, which brings a tank setback, a delivery route and a runtime figure into the design. We compare the two honestly in propane versus natural gas.

Septic and water come first on acreage

The county permits on-site sewage systems for the state, so most rural properties have a drainfield on record somewhere. We want that layout, and to know whether you are on a well or a water supply corporation, before the pad position is drawn.

Inside a city, SB 1252 applies

Since 1 September 2025, Texas SB 1252 has stopped most cities from regulating the installation or inspection of a residential backup system of 50 kW or less. Cities can still permit the electrical and fuel connections, and Burleson says plainly that it does. We check the current process with the city before we file.

The weather is the same story everywhere on our map. The May 2013 outbreak that struck Granbury also put an EF3 tornado down south-west of Cleburne, and in February 2021 the state grid operator ordered rotating outages across Texas. Storms don’t care which utility owns the line. A generator sized for the house, fueled for a multi-day run and tested under load is what keeps the heat and the water on through one.

Common questions

Johnson County questions

Utilities, fuel, county permits, manufactured homes and the well pump.

Which electric utility is on my meter?

It depends on where in the county you are, and it is worth checking before anything else. Oncor Electric Delivery owns the wire in most of the towns, which means you pick a retail provider and Oncor restores the line. Out of town the meter is often a co-op one: United Cooperative Services, which formed in 2000 when the Johnson County and Erath County electric co-ops consolidated, or HILCO Electric Cooperative, headquartered in Itasca, which lists Johnson among the five counties it serves. On a co-op meter you are a member rather than a customer, and HILCO notes that its certificate from the Public Utility Commission gives it the exclusive right to serve its territory. The top of your bill is the fastest answer, and we confirm it at the site visit.

Can I run a generator on natural gas out here?

In town, sometimes. In the country, rarely. The American Community Survey for 2020–2024 shows 15.1 percent of Johnson County households heating with piped gas, 4.1 percent with bottled or tank gas, and 79.5 percent with electricity. Atmos Energy’s Mid-Tex division serves Cleburne and Burleson, but piped gas thins out quickly past the city limits. On most acreage a standby unit means a propane tank, which means a tank setback, a delivery route for the truck and a runtime calculation we do with you rather than for you.

I live outside city limits. Who issues the permits?

Johnson County issues development permits for new construction in the unincorporated county as part of its floodplain management, and it handles on-site sewage permits as the designated representative for the Texas Commission on Environmental Quality. Neither one changes who can do the electrical work: that still takes a licensed Texas electrical contractor building to code and to the manufacturer’s instructions, which is what TECL #41587 covers. The septic permit matters to us for a different reason. If the property has a drainfield, we want its layout before we pick a pad position or dig a trench.

We live in a manufactured home. Can it have a standby generator?

Yes, and plenty of households here are asking. The same census survey counts 11,633 mobile homes in the county, 16.4 percent of all housing units, against well under two percent in Burleson. The difference in the install is mostly about where the electrical service lives. On a manufactured home it is usually on a pole or pedestal near the home rather than on the home itself, so that is where the transfer switch and the generator connection are designed to go. The generator sits on its own pad with its own clearances, not against the home.

Does the well pump need to be on the generator?

If you are on a private well, yes, and it is often the load that decides the generator size. A submersible pump has a starting surge several times its running draw, and it has to start while the air conditioning is already running. Many rural homes here are not on a well at all: member-owned water systems such as Johnson County Special Utility District and Bethesda Water Supply Corporation carry water across large parts of the county. We ask which one you are on at the first call, because it changes the load list. Our guide to generators for a well pump covers the arithmetic.

Do you cover the north end of the county around Burleson and Crowley?

Yes. Burleson and Crowley each have their own page, because the north end of the county behaves like the Fort Worth suburbs it borders rather than like the farmland to the south. Crowley is a Tarrant County city with a small piece across the Johnson County line, and Burleson straddles the same line from the other side. South of Cleburne, toward Grandview and the Hill County line, the work looks much more like the acreage around Whitney.

Two ways to start

Which one are you?

Need a generator

We start with what has to keep running at your property (the well, the AC, the freezer, the shop) and size the system around it. You get a written proposal with the equipment, the electrical work and the site prep all in one number.

Get a Generator Estimate

Already own one

Repair, diagnostics and scheduled maintenance for Generac, Kohler and Briggs & Stratton systems, including units another company installed. Tell us the brand and what it is doing and we will bring the right parts.

Call NowGet an Estimate